Short Description:
Striping, Coiling Door, Door Hardware, & Stairwell Fencing
Notes:
8/28/2020 11:11:39 AM
The scope that is being deferred to Dome Construction is as follows: - Striping @ East Drive Aisle (C-300/C-301) - Overhead Coiling Grille @ NE Garage Entry (A-200A/A-558) - Atrium Swing Door Hardware Change (A-803/A-804B) - Fence Panels @ Stairwells (A-740/A-741 + 10 2214 Specification)
8/31/2020 10:35:18 AM
B20-1284 is for the scope of work that was remaining under B16-1779. B16-1779 (Turner was General) will be finalled and the remaining scope will fall under B20-1284 (to be done by Dome)