Notes:
5/24/2021 9:16:45 AM
Furnish & Install Tenant Storage Lockers
Furnish Key Pad at Baden Storefront Door 5.21.21
Ground Control Complete Exterior Street Signage 5.28.21
Install Bike Racks in Bike Rm 6.25.21
Install Qty (4) Exterior Benches 6.25.21
Furnish & Install Water Feature at podium Lvl-4 6.25.21
Metal Design & Strategy, Inc; USGA Furnish Fire Feature at podium Lvl-4 5.21.21
Bollard at 3rd Lvl Garage; Stair A Barrier Gate 5.28.21
Seperation Fence at Trash Room 5.28.21
QLM Planting at Baden wood slat wall 5.28.21
RT Western Furnish DF&H / Window Transom at Bike Rm., opening 1.09 5.28.21
USGA Furnish Glass at Awning 5.28.21
NIC Work (PG&E)
Adjust Qty (4) Utility box covers at Baden frontage (Note: This will require concrete
finishes subsequent to PG&E Adjustment)
6.25.21
Level Qty (3) manhole covers on Third Lane 5.28.21
Street Signage 5.28.21
Lockable Full Height Gate at Stair A Stairwell Lvl-1 5.28.21
Keypad at Baden St Entrance 5.28.21
City SSF Planning Dept Planting at Baden adajacent to wood slat fence 6.25.21
Replace 3 sq of sidewalk at Yellow Taxi Driveway 6.25.21
Add Knox Boxes 6.25.21