Permit Info
Short Description:
SD feed frm planned 12-inch line to (3) 8" lines ( NOTES)
Notes:
7/24/2025 9:18:39 AM
We were required to change the SD feed from the planned 12-inch line to (3) 8-inch lines to ensure we had proper clearance between our storm drain work and the 60-inch water line that runs along Orange Avenue.
The Civil Engineer of record specified using (3) 8-inch lines in lieu of the single 12-inch for capacity during heavy rain events.
We have performed potholing to confirm our location for making this storm drain connection.
Thank you.
Parcel Info
City/State/Zip:
SOUTH SAN FRANCISCO, CA, 94080
There are currently no inspections on this record.
|
BUILDING REVIEW | WC3PERMITTECH | APPROVED | 7/29/2025 | 8/7/2025 | 8/12/2025 |
More Info
|
ENGINEERING REVIEW | ANTHONY SCHAFFER | APPROVED | 7/29/2025 | 7/29/2025 | 8/12/2025 |
More Info
|